SBX-102A C
and SBX-102A FC FIELD TEST
2-SPEED MOTOR CONTROL
Pre Set Switches
and Jumpers
- On the
front board set the Flow Switch Bypass Jumper in the switch position.
- On the
front board set the Normal/Test in the testposition.
- On the
front board set the High to Low jumper to the 3 hour position
- On the
front board set the Freeze Select jumper to the 40°position
- On the
front panel set the Automatic/Manual switch to Auto position
- On the
front panel set the Pump On/Pump Off to Pump On position
- Set
the time clock Push all the detentes away (out) from the center and rotate
the time clock 1 full turn.
NOTE:
DURING TESTING, ALLOW EACH FUNCTION TO COMPLETELY FINISH BEFORE ACTIVATING ANOTHER
SWITCH.
READ EACH STEP BEFORE PERFORMING THE ACTIONS.
Manual Operation Test
- Apply
power to unit.
The POWER indicator on front panel will turn on.
The pump and the PUMP indicator on the front panel will be off
The NO FLOW and FREEZE indicators on the front panel will be off.
The SHUT DOWN CYCLE indicator on the front panel will be off.
The T.C. ON (LD6) indicator on the front circuit board will be off.
- Turn
the AUTOMATIC/MANUAL on the front panel switch to manual.
The PUMP indicator will turn on and be green.
The pump will turn on and run in high speed.
- Turn
the PUMP ON/PUMP OFF switch to the PUMP OFF position.
The pump will turn off. The PUMP indicator will be off.
- Turn
the PUMP ON/PUMP OFF switch to the PUMP ON position.
The pump will turn on and run in high speed.
The PUMP indicator will turn on and be green.
- Turn
the AUTOMATIC/MANUAL Switch to the AUTOMATIC position.
- If the
either of the pool heater or power options is installed, the pump will run
in HIGH speed for 7-23 seconds. (Shut Down Cycle)
The SHUT DOWN CYCLE indicator will illuminate while the pump is running in
high speed.
The PUMP light will be green.
- If none
of the options are installed or when the Shut Down Cycle ends:
The pump will turn off.
The PUMP indicator on the front panel will be off.
Automatic Operation Test
- Push
some of the time clock detentes to the "on" position (detentes toward
the center of the time clock). Rotate the time clock to an "on"
position.
The PUMP indicator will turn on and be green.
The pump will turn on and run in high speed.
The T.C. ON (LD6) indicator on the front board will be on.
If either of the heater options are installed, the heater is allowed to fire
(the heater must be turned on and the thermostat must call for the heater
to turn on).
If the power option is installed, the device connected to it will be turned
on.
- Before
35 seconds has elapsed:
The PUMP indicator will change color to orange or yellow.
The pump will start running in low speed.
- Rotate
the time clock to an "off" position.
- If the
either of the pool heater or power options is installed, the pump will run
in HIGH speed for 7-23 seconds. (Shut Down Cycle)
The pool heater or device connected to the power option will be turned off.
The SHUT DOWN CYCLE indicator will illuminate while the pump is running in
high speed.
The PUMP light will be green.
The T.C. ON indicator on the front board will be off.
- If none
of the options are installed or when the Shut Down Cycle ends:
The pump will turn off.
The PUMP indicator on the front panel will be off.
The SHUT DOWN CYCLE indicator on the front panel will be off.
Top
of Page
Freeze Circuit Test (SBX-102A
F and SBX-102A FC only.)
- On the
front panel circuit board remove the wire from TB3 pin 4 (Freeze Common).
The PUMP indicator will turn on and be green.
The pump will turn on and run in high speed.
The FREEZE indicator on the front panel will be on.
- If either
of the heater options are installed, the heater is allowed to fire (the heater
must be turned on and the thermostat must call for the heater to turn on).
- If the
power option is installed, the device connected to it will be turned on.
- Install
the wire back in TB3 pin 4 (Freeze Common).
- If the
either of the pool heater or power options is installed, the pump will run
in HIGH speed for 7-23 seconds. (Shut Down Cycle)
The pool heater or device connected to the power option will be turned off.
The SHUT DOWN CYCLE indicator will illuminate while the pump is running in
high speed.
The PUMP light will be green.
- If none
of the options are installed or when the Shut Down Cycle ends:
The pump will turn off.
The PUMP indicator on the front panel will be off.
The SHUT DOWN CYCLE indicator on the front panel will be off.
Set Switches For Normal
Operation
- On front
board set the Flow Switch Bypass Jumper in the switch position.
- On front
board set the Normal/Test in the normalposition.
- On front
board set the High to Low jumper to the 3 hour position
- On front
board set the Freeze Select jumper to the 40° position
- On front
panel set the Automatic/Manual switch to Auto position
- On front
panel set the Pump On/Pump Off to Pump On position
- Set
the time clock - Push the all the detentes toward the center of the time clock
for the period of time the pump is to run.
Top
Of Page
General
Information
Following
is a description of the front circuit board selectors and indicators:
Freeze
Selects
point at which the freeze circuit turns on. An ambient air temperature of 35°or
40° can turn on the freeze protection circuit. It is strongly suggested
to use the 40 degree setting.
Flow
Used for
testing the flow sensor (pressure switch).
The SWITCH
position is used for normal operation, the flow sensor is active and senses
the water flow. If there is insufficient water flow the sensor will open and
after about 8 seconds the NO FLOW indicator will illuminate.
The BYP
position is used to bypass the switch for testing. The unit will think the flow
sensor switch is closed.
DO
NOT LEAVE THE JUMPER IN THE "BYP" POSITION. THE PUMP SAVER CIRCUITRY
WILL BE DISABLED!
High/Lo
Selects
either a 3 hour or 6 hour high speed cycle before the unit automatically switches
to low speed.
The 6 hour
cycle should be chosen for large pools or pools that need extra time for the
sweep cleaner to operate.
Normal/Test
Select
Normal or Test operation.
Switch
ing the NORMAL position all cycle times are normal. When SW3 is in the NORMAL
position the SHUT DOWN CYCLE will last for about 7 minutes.
When this
switch is in the TEST position and 3 hour operation is selected all cycle times
are drastically reduced for testing purposes.